Electrical systems for transloading installation

Location: Aruba
Market: Industry

This project concerns a completely new installation to be built for the loading and storage of sand and sand-like products. The installation has a capacity of approximately 1500 tonnes per hour. The maximum volume is set at 880 m3/hour.

Beemster Electrical Solutions B.V. has taken care of the following electrical engineering items:
Engineering, including control plans, cable list, material list, terminal list.
Delivery, assembly, installation and commissioning of the on-site installation.
Electrical layout and application software of the PLC and HMI of the tyre system control installation.

  • By filling in our contact form your personal data are processed in accordance with the provisions of our Privacy statement